Remodeling projects are scheduled to continue in '09 for SPCC. Working from the Miller Design Master Plan developed in 2001, remodeling has occurred on twelve of the eighteen holes over the past seven years.
© COPYRIGHT 2007 MILLER DESIGN, ALL RIGHTS RESERVED